OLENTANGY RIVER over OLENTANGY RIVER

0.5 MI. W. OF SR 100 · County 033, Ohio · Built 2002 · 2 Lanes · 109 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1738429
Year Built
2002
Length
32 m (105 ft)
Max Span
12.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
109
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.