CRAW-SENECA LINE over SILVER CREEK

2.6 MI. W. OF SR 4 · County 033, Ohio · Built 1978 · 2 Lanes · 92 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1735306
Year Built
1978
Length
12.2 m (40 ft)
Max Span
11.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
92
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.