CRAW-MORROW LINE over ROCKY FORK CREEK

0.6 MI. E. OF SR 309 · County 033, Ohio · Built 1972 · 2 Lanes · 1,541 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1734180
Year Built
1972
Reconstructed
2014
Length
26.5 m (86.9 ft)
Max Span
10.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,541
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$81,229,000
Total Project Cost
$81,229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.