SR 61 over PARAMOUR CREEK

2.50 MILES NORTH OF US 30 · County 033, Ohio · Built 1931 · 2 Lanes · 1,094 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
1702130
Year Built
1931
Reconstructed
2003
Length
14 m (45.9 ft)
Max Span
13.4 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,094
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$80,000
Total Project Cost
$95,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.