SR 61 over OVER NEW U.S.30(RELOCATE

1.0 MI.S.OF CRESTLINE · County 033, Ohio · Built 2004 · 2 Lanes · 4,051 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1701886
Year Built
2004
Length
72.6 m (238.2 ft)
Max Span
36 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
4,051
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.