STUMP RD 719 over SANDY CREEK

0.2 MI N SR30 · County 029, Ohio · Built 1958 · 2 Lanes · 389 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1535781
Year Built
1958
Reconstructed
2010
Length
15.2 m (49.9 ft)
Max Span
14.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
389
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.