SR 558 over MIDDLE FRK LILBEAVER CR

1.61 MI E OF SR 45 · County 029, Ohio · Built 1958 · 2 Lanes · 1,363 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1504959
Year Built
1958
Reconstructed
2001
Length
36.3 m (119.1 ft)
Max Span
13.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,363
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.