STATE ROUTE 73 over US68

INT OF SR73 AND US68 · County 027, Ohio · Built 2011 · 2 Lanes · 4,266 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 9 Excellent
Substructure 9 Excellent

Location

39.4651, -83.836911

This bridge is in worse condition than 9.7% of bridges in County 027. The average bridge in Ohio is 0 years old; this one is 15 years old.

Nearby Bridges

Bridge Details

Structure #
1402153
Year Built
2011
Length
36.7 m (120.4 ft)
Max Span
36.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
4,266
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.