Ramp B IR275 over Aicholtz Road (future)

Ramp from 275 NB to 32 EB · County 025, Ohio · Built 2014 · 2 Lanes · 17,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
1305395
Year Built
2014
Length
57.9 m (190 ft)
Max Span
23.7 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
17,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.