US 52 over BEAR CREEK

1.04 MI W OF CHILO CORP · County 025, Ohio · Built 2005 · 2 Lanes · 1,971 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1301969
Year Built
2005
Length
24.4 m (80.1 ft)
Max Span
23.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
1,971
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.