SR 28 over OBANNON CREEK

500 ft w of int SR132&28 · County 025, Ohio · Built 2015 · 2 Lanes · 12,633 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
1300180
Year Built
2015
Length
37.4 m (122.7 ft)
Max Span
37.4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
12,633
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.