BILSTEIN BOULIVARD over CSX RAILROAD

East of Fairfield HS · County 017, Ohio · Built 1964 · 2 Lanes · 18,344 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
0960411
Year Built
1964
Reconstructed
1996
Length
57.3 m (188 ft)
Max Span
21.3 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
18,344
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.