SR 122 over GREAT MIAMI RIVER

OVER GREAT MIAMI RIVER · County 017, Ohio · Built 1947 · 2 Lanes · 11,220 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0902209
Year Built
1947
Reconstructed
1993
Length
188.4 m (618.1 ft)
Max Span
25.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
11,220
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.