TRI-COUNTY HIGHWAY over FLAT RUN

8.42 MI E OF CLER CO LINE · County 015, Ohio · Built 1956 · 2 Lanes · 1,423 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0834815
Year Built
1956
Length
42.7 m (140.1 ft)
Max Span
14.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,423
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.