US ROUTE 62 over OVER USR 52

.14 MI N OF OHIO RIVER · County 015, Ohio · Built 1998 · 2 Lanes · 5,525 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
0801313
Year Built
1998
Length
58.2 m (190.9 ft)
Max Span
27.7 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
5,525
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.