CR- 29 OVER IR-70 over OVER IR-70

BEL 70 19.31 · County 013, Ohio · Built 2018 · 2 Lanes · 6,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0702677
Year Built
2018
Length
167.6 m (549.9 ft)
Max Span
45.7 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
6,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.