US40&250(NATL RD) over OHIO R. BACKCHANNEL

BRIDGEPORT @ OH ST LINE · County 013, Ohio · Built 1998 · 3 Lanes · 17,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0701823
Year Built
1998
Length
196.1 m (643.4 ft)
Max Span
79.2 m
Width
15.9 m (52.2 ft)
Lanes
3
Daily Traffic
17,100
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$772,000,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.