STEINECKER STREET over MIAMI-ERIE CANAL FEEDER

SOUTH SIDE GOODYEAR PLANT · County 011, Ohio · Built 2006 · 2 Lanes · 700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0660124
Year Built
2006
Length
23.3 m (76.4 ft)
Max Span
22.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.