MIDDLE PIKE over COPELAND DITCH

0.1 MI E OF SR 65 · County 011, Ohio · Built 1995 · 2 Lanes · 519 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0637785
Year Built
1995
Length
14.2 m (46.6 ft)
Max Span
13.2 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
519
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.