SOUTHLAND ROAD over CARTER CREEK

0.9 MI E OF SR 66 · County 011, Ohio · Built 1965 · 2 Lanes · 198 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0635871
Year Built
1965
Reconstructed
2017
Length
16.5 m (54.1 ft)
Max Span
15.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
198
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$79,000,000
Total Project Cost
$118,641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.