SR-198 over AUGLAIZE RIVER

1.3MI.S.OF ALLEN CO. · County 011, Ohio · Built 1966 · 2 Lanes · 1,119 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0603007
Year Built
1966
Length
73.2 m (240.2 ft)
Max Span
27.4 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,119
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.