SHARP RUN RD over SHARPS RUN

JCT OF TR 230 · County 009, Ohio · Built 2023 · 2 Lanes · 40 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0545431
Year Built
2023
Length
15.9 m (52.2 ft)
Max Span
14.6 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
40
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.