USR 50 over HOCKING RIVER OVERFLOW

0.3M W OF JCT SR 329 · County 009, Ohio · Built 1999 · 2 Lanes · 3,767 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0501875
Year Built
1999
Length
61.9 m (203.1 ft)
Max Span
16.8 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
3,767
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.