USR 50 over E STATE&HOCK-ADENA BKWY

2.5 MI W OF JCT SR 690 · County 009, Ohio · Built 1975 · 3 Lanes · 14,063 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0501611
Year Built
1975
Length
138.7 m (455.1 ft)
Max Span
25.3 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
14,063
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.