LAMPSON ROAD over COFFEE CREEK

1.O MI. W. OF SR 45 · County 007, Ohio · Built 1998 · 2 Lanes · 209 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0431680
Year Built
1998
Length
21.3 m (69.9 ft)
Max Span
20.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
209
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.