COUNTY ROAD 673 over ORANGE CREEK

.04 M N/W OF SR 58 · County 005, Ohio · Built 1969 · 1 Lanes · 98 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
0334308
Year Built
1969
Length
15.2 m (49.9 ft)
Max Span
14.6 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
98
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.