SR 95 over LAKE FORK OF MOHICAN RV

2.95 MI E SR 89 · County 005, Ohio · Built 1947 · 2 Lanes · 593 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0303933
Year Built
1947
Length
44.5 m (146 ft)
Max Span
16.5 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
593
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.