SR 60 over NEWELL RUN

2.93 MI N US 30 · County 005, Ohio · Built 1993 · 2 Lanes · 5,838 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0302147
Year Built
1993
Length
25 m (82 ft)
Max Span
9.1 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
5,838
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.