USR 42 over JEROME FORK

1.7 MI N OF SR250 · County 005, Ohio · Built 2020 · 2 Lanes · 4,000 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

40.884081, -82.284539

This bridge is in worse condition than 2.8% of bridges in County 005. The average bridge in Ohio is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
0301330
Year Built
2020
Length
22.6 m (74.1 ft)
Max Span
21.6 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.