SR 39 over BLACK FORK OF MOHICAN RI

.9 MI E OF SR95 · County 005, Ohio · Built 1989 · 2 Lanes · 3,432 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
0300926
Year Built
1989
Length
57 m (187 ft)
Max Span
21.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,432
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.