LIMA - METCALF ST over OTTAWA RIVER - METCALF S

0.27 MI S OF ELM ST · County 003, Ohio · Built 1993 · 2 Lanes · 11,212 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0249602
Year Built
1993
Length
40.2 m (131.9 ft)
Max Span
19.4 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
11,212
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.