HAY RD. over AUGLAIZE RIVER HAY RD
0.45 MI S OF FAULKNER RD · County 003, Ohio · Built 1909 · 1 Lanes · 175 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.674356, -83.918436
This bridge is in worse condition than 42.3% of bridges in County 003. The average bridge in Ohio is 0 years old; this one is 117 years old.
Nearby Bridges
HAY RD. over AUGLAIZE RIVER HAY RD
Built 1987
PARKER RD. over STREAM PARKER RD
Built 1962
FAULKNER RD. over AUGLAIZE RIVER FAULKNER
Built 1955
PARKER RD. over STREAM PARKER RD
Built 1971
PHILLIPS RD. over AUGLAIZE RIVER PHILLIPS
Built 1994
PHILLIPS RD. over STREAM PHILLIPS ROAD
Built 1973
FAULKNER RD. over AUGLAIZE RIVER FAULKNER
Built 1986
PHILLIPS RD. over STREAM PHILLIPS RD
Built 1976
FAULKNER RD. over AUGLAIZE RIVER FAULKNER
Built 1994
AMHERST RD. over STREAM AMHERST RD
Built 1977
Bridge Details
- Structure #
- 0234753
- Year Built
- 1909
- Length
- 14.6 m (47.9 ft)
- Max Span
- 11.6 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 175
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.