SR103 over RILEY CREEK #

1.06 Mi. W. of IR 75 · County 003, Ohio · Built 2019 · 2 Lanes · 4,800 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0203603
Year Built
2019
Length
28.2 m (92.5 ft)
Max Span
10.7 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
4,800
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.