SR 81 over PATTERSON DITCH

5.0 mi. East of IR 75 · County 003, Ohio · Built 1949 · 2 Lanes · 3,172 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
0203483
Year Built
1949
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
3,172
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,000
Total Project Cost
$35,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.