IR 75 NB over LITTLE RILEY CREEK

2.66 mi. North of USR 30 · County 003, Ohio · Built 1955 · 2 Lanes · 15,861 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0202762
Year Built
1955
Length
20.3 m (66.6 ft)
Max Span
7.6 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
15,861
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.