SR 65 over SUGAR CREEK

SR 65 1/4 MI N OF JCT 115 · County 003, Ohio · Built 2002 · 2 Lanes · 5,151 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0201405
Year Built
2002
Length
32.1 m (105.3 ft)
Max Span
12.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
5,151
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.