USR 30 WB over PIKE RUN

1.20 mi. West of SR 115 · County 003, Ohio · Built 1969 · 2 Lanes · 4,832 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0200336
Year Built
1969
Length
20.3 m (66.6 ft)
Max Span
7.6 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
4,832
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.