USR 30 WB over LEATHERWOOD DITCH

3.29 mi. East of SR309 · County 003, Ohio · Built 1968 · 2 Lanes · 4,669 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0200123
Year Built
1968
Length
18.3 m (60 ft)
Max Span
6.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
4,669
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.