STATE HIGHWAY 200 over GARRISON DAM SPILLWAY
1 MILE SW OF RIVERDALE · County 055, North Dakota · Built 1955 · 2 Lanes · 995 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.487692, -101.385342
This bridge is in worse condition than 20.7% of bridges in County 055. The average bridge in North Dakota is 0 years old; this one is 71 years old.
Bridge Details
- Structure #
- 200-178-423
- Year Built
- 1955
- Length
- 480 m (1574.8 ft)
- Max Span
- 13.3 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 995
- Material
- Prestressed Concrete
- Design
- Girder and Floorbeam System
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $5,000
- Total Project Cost
- $8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.