SCENIC LOOP DRIVE over JULES CREEK

SCENIC LOOP DRIVE MILEPOS · County 007, North Dakota · Built 1960 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1540003P0000000
Year Built
1960
Reconstructed
1984
Length
6.9 m (22.6 ft)
Max Span
3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
200
Material
Concrete Continuous
Design
Slab
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$65,000
Total Project Cost
$97,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.