ND HIGHWAY 200 over KNIFE RIVER OVERFLOW

1 EAST OF HAZEN · County 057, North Dakota · Built 1952 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0200152869
Year Built
1952
Reconstructed
2013
Length
36.6 m (120.1 ft)
Max Span
9.8 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,300
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$181,000
Total Project Cost
$272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.