INTERSTATE 94 over EAST MIDWAY INTERCHANGE

3 WEST OF US 83 NORTH · County 059, North Dakota · Built 1965 · 3 Lanes · 9,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
0094156069 R
Year Built
1965
Reconstructed
1993
Length
67.1 m (220.1 ft)
Max Span
25.9 m
Width
17.6 m (57.7 ft)
Lanes
3
Daily Traffic
9,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.