US 81/52ND AVE.STH over COOK COULEE
1 EAST OF I-29 · County 017, North Dakota · Built 2008 · 3 Lanes · 6,230 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
46.803442, -96.8239
This bridge is in worse condition than 40.7% of bridges in County 017. The average bridge in North Dakota is 0 years old; this one is 18 years old.
Nearby Bridges
US 81/52ND AVE.STH over COOK COULEE
Built 2008
25TH ST SOUTH over ROSE CREEK
Built 1989
US HIGHWAY 81 over I-29/52ND AVE.STH INT.
Built 2008
US HIGHWAY 81 over I-29/52ND AVE.SOUTH INT.
Built 2008
40TH AVE SW over ROSE CREEK
Built 1995
64TH AVE SOUTH over I-29/64TH AVE S SEP
Built 2022
US HIGHWAY 81 over ROSE COULEE
Built 2009
INTERSTATE 29 over 40TH AVE SW SEP - FARGO
Built 2000
INTERSTATE 29 over 40TH AVE SW SEP. - FARGO
Built 1999
38TH ST SW over 40TH AVE SW
Built 2000
Bridge Details
- Structure #
- 0081920791 R
- Year Built
- 2008
- Length
- 40.2 m (131.9 ft)
- Max Span
- 13.4 m
- Width
- 18.7 m (61.4 ft)
- Lanes
- 3
- Daily Traffic
- 6,230
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.