ND HIGHWAY 200 over I-29/MAYVILLE INT
JUNCTION ND 200 · County 097, North Dakota · Built 1970 · 2 Lanes · 755 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.497944, -97.085817
This bridge is in worse condition than 41.5% of bridges in County 097. The average bridge in North Dakota is 0 years old; this one is 56 years old.
Nearby Bridges
ND HIGHWAY 200A over BNRR SEPARATION OVERHEAD
Built 1971
COUNTY HIGHWAY over I-29/CUMMINGS SEPARATION
Built 1970
COUNTY HIGHWAY over I-29/TAFT SEPARATION
Built 1970
INTERSTATE 29 over BNSF SEPARATION
Built 1969
INTERSTATE 29 over BNSF SEPARATION
Built 1969
INTERSTATE 29 over BRANCH OF BUFFALO COULEE
Built 1969
COUNTY HIGHWAY over I-29/BUXTON SEPARATION
Built 1970
COUNTY HIGHWAY over DRAINAGE DITCH
Built 2002
COUNTY HIGHWAY over BUFFALO COULEE
Built 2016
ND HIGHWAY 200 over INTERMITTENT STREAM
Built 1971
Bridge Details
- Structure #
- 0029110795
- Year Built
- 1970
- Reconstructed
- 2011
- Length
- 85.3 m (279.9 ft)
- Max Span
- 30.8 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 755
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.