COUNTY HIGHWAY over I-29/AMENIA SEPARATION

2 NORTH HARWOOD INTERCHG · County 017, North Dakota · Built 1970 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
0029074991
Year Built
1970
Length
85.3 m (279.9 ft)
Max Span
30.8 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$294,000
Total Project Cost
$441,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.