ND HIGHWAY 27 over SHEYENNE RIVER

1 BLK W OF MAIN · County 073, North Dakota · Built 1953 · 2 Lanes · 2,380 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0027019057
Year Built
1953
Reconstructed
1995
Length
39.6 m (129.9 ft)
Max Span
18.9 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
2,380
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.