ND HIGHWAY 20 over SWEETWATER LAKE OVERFLOW
2 SOUTH WEBSTER · County 071, North Dakota · Built 1967 · 2 Lanes · 1,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.257011, -98.876275
This bridge is in worse condition than 58.3% of bridges in County 071. The average bridge in North Dakota is 0 years old; this one is 59 years old.
Nearby Bridges
ND HIGHWAY 20 over CREEK
Built 1966
SECTION LINE TRAIL over COULEE
Built 2021
COUNTY HIGHWAY over MORRISON OVERFLOW CHAN
Built 1984
COUNTY HIGHWAY over COULEE
Built 1980
COUNTY HIGHWAY over SWEETWATER LAKE
Built 1981
COUNTY HIGHWAY over COULEE
Built 1991
COUNTY HIGHWAY over CHANNEL A
Built 1971
COUNTY HIGHWAY over STARKWEATHER COULEE
Built 1989
COUNTY HIGHWAY over COULEE
Built 1979
COUNTY HIGHWAY over EDMORE COULEE
Built 1940
Bridge Details
- Structure #
- 0020113539
- Year Built
- 1967
- Length
- 12.2 m (40 ft)
- Max Span
- 11.6 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,400
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.