3RD AVE N.W. over Souris River
3RD AVE-4TH ST NW-MINOT · County 101, North Dakota · Built 1977 · 4 Lanes · 8,400 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
48.239431, -101.29845
This bridge is in worse condition than 77.6% of bridges in County 101. The average bridge in North Dakota is 0 years old; this one is 49 years old.
Nearby Bridges
US HIGHWAY 83 over BNRR-CP-MOUSE RIVER
Built 2018
6TH STREET NW over Souris River
Built 2000
3RD ST. N.E. over 4TH AVE BNRR SOURIS R.
Built 1936
3 RD AVE N.W. over Souris River
Built 1976
2ND AVENUE S.W. over Souris River
Built 1968
7TH STREET NE over Souris River
Built 1993
4TH AVE N.W. over Souris River
Built 2016
US 2 BUSINESS RT over CP RAILWAY
Built 1980
16TH ST S.W. over Souris River
Built 1979
US 2 BUSINESS RT over SOURIS RIVER
Built 1995
Bridge Details
- Structure #
- 0000MNOT09
- Year Built
- 1977
- Length
- 53.3 m (174.9 ft)
- Max Span
- 14 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 4
- Daily Traffic
- 8,400
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $293,000
- Total Project Cost
- $440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.