COUNTY ROAD over EGG CREEK

7 WEST 1 SOUTH WOLSETH · County 101, North Dakota · Built 1955 · 2 Lanes · 110 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000051145250
Year Built
1955
Length
7.6 m (24.9 ft)
Max Span
7.3 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
110
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.