COUNTY HIGHWAY over GOOSE RIVER

3 EAST 1 SOUTH MAYVILLE · County 097, North Dakota · Built 2014 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000049110130
Year Built
2014
Length
46.9 m (153.9 ft)
Max Span
15.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$196,000
Total Project Cost
$294,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.